![]() ![]() Throughout the whole project, the integral model ensured effective communication and early design omissions identification. It was used for Clash Detection (both visual and automatic). All the documents necessary for construction, such as drawings, quantity take-offs, reinforcement schedules and lists of equipment were generated based on these Revit models.įor BIM Coordination, Integral model was created and managed in Navisworks. Water & Sanitation systems analysis & designĪrchitectural, Structural, Process Engineering & Piping, Plumbing & Drainage, and Electrical Models were created in Revit for Conceptual design, Detailed Design and Documentation Phases.Open parking space for 840 cars, neighborhood improvement design and planning. Optimised construction services from experienced and skilled construction teams, who will reliably realise your modern shop and centre concept calculation. Layout and design of the mezzanine area – offices and utility premises (executive offices, meeting rooms, security post, medical care room, employee room, legal and management departments). ![]() Technical unit boiler (boiler-house, transformer sub station, etc.) DecemIf you want to build a mall, you’ll need the answers to many questions.Non-food store including space zoning (selling-floor, offices for working with legal entities and individuals, back stores).Layout and design of the 1st floor of the shopping mall comprises: ![]() Design of a rectangular single-story building with a two-level part of the floor (mezzanine) with an area of 17, 910 sq.m and an average height of 11.2 m.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |